scenario packs/reporting

Budget-to-actuals per manager

Every manager gets their controllable spend, flagged and drillable — without logging into anything.

Autoeval difficulty: moderateReal-estate fund · self-storage

What this pack does

  • Cuts each property's P&L to the manager's controllable categories
  • Flags variances over the line — not over everything
  • Answers “where did I spend it” one click down
  • Delivers on schedule, to every manager, without a login

How to use it

  1. 1
    Connect read-only

    Banks, billing, and your current ledger. Live in 48 hours; nothing changes in your systems.

  2. 2
    Set the mode

    Manual, Assist, or Auto. Every pack starts in Assist — TAMi drafts, you approve.

  3. 3
    Watch the first run

    Every action logged with its reason. Exceptions held, never forced.

  4. 4
    Raise the ceiling

    Move it to Auto when the track record has earned it. Pull it back any time.

Workflow

triggerThe month seals

Two dozen properties close on the same ledger. The report run starts itself.

buildOne view per manager

Repairs, utilities, travel, auctions — the categories they control, budget against actual.

flagVariances over the line light up

Over 10% or $500 gets flagged with its driver. Everything else stays quiet.

logEvery number opens to its entries

“Where did I spend it” is a click, not a request to finance.

hold · waits for a personA new cut asks first

The recurring pack runs alone once proven. A new format waits for finance's sign-off.

where this pack comes from“They can get the high-level numbers, but their next question is always: okay, where did I spend it? Pulling that detail is extra work, so half the time they don't bother.”Frank · VP finance, self-storage investment firm

part of our eval suite · difficulty: moderate · builds that fail it don't ship

More packs